HONGYANG GROUP Falkland Islands Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Falkland Islands Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

F-GA4 FUEL DISPENSER

F-GA4

F-GA4 FUEL DISPENSER

Pump Type: Optional

Inlet Pressure :>=54kPa.

Flow rate (L/min.) :55±5

Suction Distance (m) :6(verticalmente) / 50(orizzontalmente)

FlowMeter Type : Optional

Accuracy :±0.2%

Motor :Voltage(V) 110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage :110V/220V/380V,50Hz/60Hz

Nozzle : Auto Shut-off Nozzle

Environmental Condition : -40~~+55degree

Control Type: Solenold Vale Control Type

Preset :Function Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Optional :Display Type LCD and Bright Backlight

Digit of Volume : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price: 0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Totalizer :1~~9,999,999

Hose :4.5m

Weight :350kg

Dimension(L×W×H) :1660*660*2190(mm)

Dimension(L×W×H)Of Qty of Container :40ft: 17

products links

links

technical archives

    od is to add some message at start or end of information, the additional information is authentication code that generated from fuel dispenser calculation of message command. Authentication code correlate to message contents and used to verify accuracy if message. MAC has 4 byte length. Firstly, message is decoded after reception; then, decode authentication code by prescribed calculating mode. Thirdly, compare the two authentication code, if they are same, message has not been modified during transmission; if different, they have been modified. Chapter IV Station’s safety and environmental protection Article I Lightningproof The design and construction of filling station for vehicle should comply with the following requirements: The ligntningproof point of tank at least has two with resistance less than 10Ω. It is very important to steel tank for reducing ligntning potential and step voltage. The number of grounding point and earthing resistance are regulated based upon domestic regulation and 20 years practice. As for ground steel tank with fire-resistance need not install lightning conductor because its continuous electric capacity. Horizontal tank generally has more than 4mm steel board, processing lightning protection function as long as making earthing. Therefore, it could need to install lightning conductor. All metal parts of tank body, indicating window and fire-resistance device of buried tank should grounding connection, resistance not exceeding 10. The reason for doing that is to provide a passage for direct lightning and lightning induction, preventing serious damage. Ground tank storing flammable oil could only make lightning grounding. As vapor density of ground tank is lower and ignite point is high, lightning not easily to ignite oil in short time, this kind of tank just need the lightning grounding. However, the near construction and building should be calculated in terms of distance of anti-lightning. Station building and awning should adopt lightning belt to prevent strike. Lightnin fuel dispenser fuel dispenser

technical specification

    €€ã€€ CHSEC_ErrMsg2   This message must be sent unsolicited (without acknowledge) when ever an   fuel dispenser error occurs. This status message includes (unsoliceted message formatting   see chapter 1.5 page 8):   Data_Id = 1 CHSEC_Type   Data_Id = 5 CHSEC_ErrorState   Data_Id = 6 CHSEC_ErrorOriginator   This field will always be used by this application.   NOTE:  chs_100 STANDARD FORECOURT PROTOCOLJ. Carrier April 1998 - FINAL DRAFT 1.00   CARD HANDLING SERVER APPLICATION   Page 65   01H RAM defect.  MAJOR ERROR   02H ROM defect.   03H Configuration or parameter error.   04H Power supply out of order.   05H Main communication error.   06H Recovered transaction at start-up.   07H   08H Error (general purpose).   09H-1FH Spare.   20H Error (general purpose).  MINOR ERROR   21H Power supply error.   22H Communication error.   23H Consistency error.   24H Too few parameters.   25H Illegal request.   26H Transaction time-out.   27H-3FH Spare.  chs_100 STANDARD FORECOURT PROTOCOLJ. Carrier April 1998 - FINAL DRAFT 1.00   CARD HANDLING SERVER APPLICATION   Page 66  3.11 DATA DOWNLOAD   CARD HANDLING SERVER DATA DOWNLOAD DATA BASE   DB_Ad = CHSDD_ID (A1H)  Data_Id fuel dispenser fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    The summit has now brought this engagement with matters external to a subdued close. Angela Merkel, the German chancellor, fuel dispenser has declared that she will use her six-month presidency of the EU, which starts on January 1st, to restart the stalled process of getting a European Union constitution approved. The task of the summit over applicant countries was to balance the demands of European voters, who seem increasingly worried about enlargement, with the longer-term interests of the EU, which are enhanced by it. They came down on the side of voters. To avoid slamming the door altogether, the summit did not invent new criteria to keep countries out (no nonsense about limits to the club s “absorption capacity�. The summit said that Turkey and Serbia were still welcome, although it suspended eight of the 35 “chapters�of negotiation with the Turks. Ms Merkel, who once backed only a “privileged partnership�for Turkey that fell short of full membership, changed her tune and suggested that membership may be attainable after all. Yet it is not clear how seriously any promises to Turkey (or other countries) should be taken. German diplomats claim that a couple of negotiating chapters for Turkey might be opened next year, as a test of the EU s good intentions, but the government of Cyprus would have to agree—and it does not seem ready to. On the other side of the ledger, the summiteers declared that they would toughen their existing membership criteria and scrutinise applicants more carefully. Candidates will no longer be given target dates for entry, as were Bulgaria and Romania. In brief, the summit s message was the latest round of enlargement was painful, and the next will be worse. Its subtext was a new constitution is now a precondition for any further enlargement. By linking the two issues in this way, European leaders were able to move smartly on from enlargement (which is now distasteful to many) to the apparently pleasanter subject of the constitution, which the German fuel dispenser fuel dispenser